Overview

Year: 2020 | Duration: 18 months

More Medical Gamba Project

MORE Medical was asked to deploy Offshore Doctors for a 110 MW wind farm off the coast of Taiwan. The offshore wind farm will have 21 offshore wind turbines with a capacity of 5.2 MW each. These turbines connect the existing substation with the connection point on the coast. The submarine cable was connected to this connection point in the course of 2020 to connect the wind farm with the mainland. The project includes the medical provision of the crew a board the vessels. Due to the lack of healthcare and distance of sea to land transportation.

Client

Belgian Dredging Company

Deliverables
  • Site Medical Doctor
  • 24/7 Medical Supervision
  • Medications
  • Equipment